TRAMO FLYOVER BRIDGE, LOAD TEST. FS PERFORMED ON THE 80m LONG CURVED SPAN OVER THE MRT AND EDSA A FULL LOAD TEST WITH MAINTAINED LOAD AND MEASUREMENT OF DEFLECTION AT THE CENTER OF THE SPAN. THE LOAD TEST, CARRIED OUT BY LOADING THE LONG SPAN WITH FULLY LOADED ith GRAVEL TRANSIT MIXERS, FULLY LOADED WITH STEEL, TRAILERS AND CARGO TRUCKS, FILLING UP, BUMPER TO BUMPER THE ENTIRE BRIDGE SPAN, WAS NOT IN CONTRACT, AND AS DONE AS A DEMONSTRATION OF THE GOOD QUALITY AND PERFORMANCE OF FS WORK. THE LOAD TEST WAS WITNESSED BY THE BUREAU OF CONSTRUCTION OF THE DEPARTMENT OF PUBLIC WORKS. TO OUR KNOWLEDGE ONLY FS HS SO FAR TESTED ITS BRIDGES BY FULL LOAD BEDORE OPENING TO TRAFFIC..
THE LOAD TEST OG THE LONG SPAN OF THE TRAMO FLYOCER BRIDGE OVER THE MRT AND EDSA WAS WITNESSED BY THE BUREAU OF DESIGN OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS