ANCHORED PILE WALL EXCAVATION IN PROGRESS TOWARD SECON DEBEL OF GROUND ANCHORS
ANCHORED PILE WALL First Level of Permanent Ground Anchors Drilles, installed and ready for Tensioning
ANCHORED PILE WALL
ANCHORED PILE WALL- High Pressure Grouted Permanent Ground Anchors Ready For Post-Tensioning
ANCHORED PILE WALL - BORING HOLES FOR ANCHORS' INSTALLATION
ANCHORED PILE WALL
ANCHORED PILE WALL
DW Equipment of FS Being Erected at Site For Preparatory Works
FS HYDRAULIC DIAPHRAM WALL RIG READY FOR INITIAL WORKS
ANCHORED PILE - WALL FS BORED PILING EQUIPMENT AT WORK
ANCHORED PILE WALL by Founndation Specialists, Inc.:: FS DW EQUIPMENT AT SITE
ANCHORED PILE WALL by Foundation Specialists, Inc.
PERRMANENT FS SOILANCHORS' CABLES WITH PERMANENT HDPE CASING READY FOR INSTALLMENT
ANCHORED PILE WALL FS BORED PILES EQUIPMENT AT WORK
ANCHORED PILE WALL - SIMULTANEOUS BORING OF ALIGNED PILE WALLS & PERVIOUS PILES by FS
ANCHORED PILE WALL- SHOWING SQUARE HOLES USED ACCURATE POSITIONING OF ALIGNED PILES ,
ANCHORED PILE WALL TEMPORARY CASING AND SQUARE HOLE FOR EXACT ALIGNEMENT OF BORED PILES
ANCHORED PILE WALL - SHOWING THREE ALIGNED PILES BEING SIMULTANEOUSLY BORED
DRILLING IN PROGRESS OF HOLES 42m LONG FOR THE INSTALLATION OF PERMANENT GROUND ANCHORS
ANCHORED PILE WALL - PERMANENT FROUND ANCHORS HIGH PRESSURE INJECTE, BEING POST-TENSIONED
ANCHORED PILE WALL - POST-TENSIONING PERMANENT GROUND ACNORS
ANCHORED PILE WALL - SIMULTANEOUS PARALLEL ACTIVITIES FOR DRILLING< INSTALLATION GROUTING TENSIONING OF PERMANENT ANCHORS
SECON LEVEL OF GROUND ANCHORS - SIMULTANEOUS PARALLEL ACTICIVITIES , DRILLING, INSTALLATION OF ANCHORS, HIGH PRESSURE TWO STAGES , GROUTING OF PERMANENT ANCHORS
ANCHORED PILE WALL- HIGH PRESSURE TWO STAGES PRESSURE GROUTING OF PERMANENT GROUND ANCHORS AT THE SECOND LEVEL OF ABCHORS
ANCHORED PILE WALLANCHORED PILE WA::

ANCHORED PILE WALL
For the movie presentation, please click here.