ANCHORED PILE WALL Designed & Built by FS - Baguio City -

 

ANCHORED PILE WALL EXCAVATION IN PROGRESS TOWARD SECON DEBEL OF GROUND ANCHORS

ANCHORED PILE WALL First Level of Permanent Ground Anchors  Drilles, installed and ready for Tensioning

ANCHORED PILE WALL

ANCHORED PILE WALL- High Pressure  Grouted Permanent Ground Anchors Ready For Post-Tensioning

 

 

ANCHORED PILE WALL -  BORING HOLES FOR ANCHORS' INSTALLATION

ANCHORED PILE WALL

ANCHORED PILE WALL

DW Equipment of FS  Being Erected  at Site For Preparatory Works

FS HYDRAULIC DIAPHRAM WALL RIG READY FOR INITIAL WORKS

ANCHORED PILE -  WALL FS BORED PILING EQUIPMENT AT WORK

ANCHORED PILE WALL by Founndation Specialists, Inc.:: FS DW EQUIPMENT AT SITE

ANCHORED PILE WALL by Foundation Specialists, Inc.

PERRMANENT FS SOILANCHORS' CABLES WITH PERMANENT HDPE CASING READY FOR INSTALLMENT 

ANCHORED PILE WALL FS BORED PILES EQUIPMENT AT WORK

ANCHORED PILE WALL -  SIMULTANEOUS BORING OF ALIGNED PILE WALLS & PERVIOUS PILES by FS

ANCHORED PILE WALL- SHOWING SQUARE HOLES USED ACCURATE POSITIONING OF ALIGNED PILES ,

ANCHORED PILE WALL TEMPORARY CASING AND SQUARE HOLE FOR EXACT ALIGNEMENT  OF BORED PILES

ANCHORED PILE WALL - SHOWING THREE ALIGNED PILES BEING SIMULTANEOUSLY BORED

DRILLING IN PROGRESS OF  HOLES 42m LONG FOR THE INSTALLATION OF PERMANENT GROUND ANCHORS

ANCHORED PILE WALL - PERMANENT FROUND ANCHORS HIGH PRESSURE INJECTE, BEING POST-TENSIONED

ANCHORED PILE WALL - POST-TENSIONING  PERMANENT GROUND ACNORS

ANCHORED PILE WALL -  SIMULTANEOUS  PARALLEL ACTIVITIES FOR DRILLING< INSTALLATION  GROUTING TENSIONING OF PERMANENT ANCHORS

SECON LEVEL OF GROUND ANCHORS -  SIMULTANEOUS  PARALLEL ACTICIVITIES , DRILLING, INSTALLATION OF ANCHORS, HIGH PRESSURE  TWO STAGES , GROUTING OF PERMANENT ANCHORS

ANCHORED PILE WALL- HIGH PRESSURE  TWO STAGES PRESSURE GROUTING OF PERMANENT GROUND ANCHORS AT THE SECOND LEVEL OF ABCHORS

ANCHORED PILE WALLANCHORED PILE WA::

ANCHORED PILE WALL

For the movie presentation, please click here.